July 2017 Construction Update

Construction is moving along nicely at 210 West Comstock. The 2nd floor is now framed and walls are beginning to take shape for the 3rd floor. We are excited to get a chance to walk on the 3rd floor home to see what the outlooks are like. Talking with the site superintendent and architect it is impressive the lengths they are going to for making the building as sound proof as possible. Between each floor going from the top down will be a 1 ½” layer of Gyp- Crete, acoustical membrane, engineered ceiling joists, insulation, drywall, mechanical sound dampener, air gap, and two more layers of drywall. The acoustical engineer for the building is the same one that designs some of the most recent high rise buildings in Seattle.